Removal & Wall Prep

The phase most installations get wrong. Aurora Field treats substrate preparation as its own discipline — scored removal, moisture testing, skim-coat repair, and manufacturer-specified priming before a single panel is hung.

Why Prep Is the Installation

A wallcovering installation is only as durable as the surface it adheres to. In commercial renovation contexts — hotels being refreshed, office corridors being rebranded, multifamily buildings cycling between tenants — the existing substrate has usually seen one or more previous wallcovering installations, adhesive residue, paint over adhesive, and in some cases minor water intrusion that was patched rather than fully remediated.

Aurora Field's removal process starts with a scored perforation pass on the existing wallcovering (using a Paper Tiger or equivalent scoring tool) followed by enzyme-based removal solution applied in sections. This approach minimizes damage to the drywall facing paper, which is the most common substrate failure point in commercial renovation. Tearing the facing paper off with the old wallcovering means the new installation will bubble, delaminate, or show seam shadows within months.

After removal, every wall receives a moisture test. If readings exceed the manufacturer's recommended threshold for the specified product, we document the issue and notify the project manager before proceeding.

Large commercial space wall with venetian plaster finish during construction phase wall prep

The Prep Sequence

1

Site Protection

Flooring covered with Ram Board or heavy poly. Electrical outlets covered. Adjacent surfaces protected from moisture and solution overspray.

2

Scoring & Solution Application

Existing wallcovering scored with a perforation tool to allow removal solution penetration. Enzyme-based solution applied in sections and allowed to dwell per product instructions. This controlled approach prevents the drywall facing paper from coming away with the old wallcovering.

3

Removal & Adhesive Stripping

Old wallcovering removed in panels. Residual adhesive neutralized and scraped. Surfaces allowed to dry completely before assessment.

4

Moisture Testing

Pin meter readings taken at multiple points per wall. Results logged. Any readings above threshold documented and reported to the project manager before prep continues.

5

Skim-Coat & Sanding

Damaged facing paper areas skim-coated with joint compound and sanded smooth. Fastener dimples, seam ghosting, and surface irregularities addressed. Final surface is flat to a straightedge.

6

Primer Application

Manufacturer-specified primer applied — not a generic interior primer. For most commercial wallcovering products, this is a clear acrylic sizing that seals the substrate, reduces porosity, and controls adhesive absorption to prevent cold seams.

Standalone Prep or Bundled

Wall prep is offered as a standalone service for GCs or property managers who have their own installation crews but need a reliable prep contractor to bring walls to a ready state. It is also available bundled with our installation services as a full-cycle engagement.

For renovation projects where the scope of substrate damage is unknown until demo begins, we work on a time-and-materials basis for the prep phase, with a fixed estimate for the installation phase once the walls are assessed.

Request a Project Quote

Describe the scope — number of walls, existing material type, known substrate conditions. We respond within 24 hours.